ORBOTECH Industrial Park
Project Name
ORBOTECH Industrial Park
Field of Activity
Final Design
Specialization
Urban and Regional Development
Client
Private Sector
Location
Israel
Project Duration
1993-1995
Project Cost
US$ 3.5 million
Services Provided:
|
The town of
|
Following client's guidelines, the entire park's surface was covered with interlocking paving blocks, laid on sandy soil – characteristic to this region – covered with sub-base layers. The requirement to use interlocking blocks was motivated by: (a) applying a cleaner appearance and, (b) enabling an easy maintenance access to underground facilities without damaging the paved surface.
The design had to cope with an adjacent major underground infrastructure facility on a national scale, namely the National Water Carrier (over 40" in diameter). |